DUMP TRAILER Electrical power UNIT

DUMP TRAILER Power UNIT-DOUBLE ACTING
Basic Description
This electrical power unit includes a power up power down circuit with load holding on both A & B ports. A pressure compensatred movement management is often additional to circuit to control the decent speed on the cylinder.
Special Notes
1. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean all of the hydraulic components concerned in advance of installation of the electrical power unit.
three. Viscosity from the hydraulic oil shoud be 15~46 cst, which should really also be clean and totally free of impurities. N46 hydraulic oil is proposed.
4. The energy unit should be mounted horizontally.
5. Check the oil level while in the tank right after the original running with the energy unit.
six. Oil shifting is required right after the original one hundred operation hrs, afterwards as soon as every 3000 hrs.

DUMP TRAILER Electrical power UNIT- SINGLE ACTING
Common Description
This electrical power unit includes a electrical power up gravity down circuit. Start out the motor to extend the cylinder and activate the solenoid valve to retract the circuit. Guide override to solenoid valve might be offered if essential. Also a pressure compen sated flow manage is usually added to the circuit to regulate the descent pace on the cylinder.
Remark: Please seek advice from our income engineer for the different pump displacement, motor electrical power or tank capacity.
Particular Notes
one. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
two. Clean every one of the hydraulic elements concerned ahead of installation of the power unit.
three. Viscosity with the hydraulic oil shoud be 15~46 cst,which should also be clean and cost-free of impurities.N46 hydraulic oil is proposed.
four. The power unit needs to be mounted horizontally.
five. Check the oil level while in the tank right after the original operating of your energy unit.
six. Oil transforming is needed after the preliminary a hundred operation hrs, afterwards the moment every 3000 hrs.

Tags:

Recent Posts

nm coupling

As one of leading nm coupling manufacturers, suppliers and exporters of products, We offer nm coupling and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of nm coupling